Ben Wallace MP has provided the Branch with a short letter detailing that the closure of the Norcross site is a provisional decision based on suitable transport links being put in place for Peel Park access, a plan needing to be signed off by the Minister prior to DWP giving notice on their contract with Telereal Trillium to lease Norcross.
A copy of the letter can be found here.